MSD Truegrid, Dunboyne

Client

MSD Dunboyne Biologics

Project Duration

18 months

Design Team

Architect: MSD
Engineer: Jacobs Engineering

Project Description

As the main contractor, we successfully completed various works across multiple areas. In the Warehouse Area, we reconfigured the existing freezer room and carried out associated works. In the Cell Culture Room (LAC Level 1), we undertook the reconfiguration of the existing room and its associated works. For the Microbiology Lab Area, we ensured the protection of the existing area and made all necessary restorations upon completion. Similarly, in the Cell Biology Area (LAC Level 1), we protected the existing area and restored it after the work was completed. The Sample Control Room (LAC Level 1) saw the protection of the existing area and a reconfiguration of its entrance. In the Analytical Lab (LAC Level 2), we protected the existing area and made good after the work was finished. Additionally, we protected the Clean Room Areas and restored them upon completion of the works.

Back To Projects

Similar Projects

Meira GTx, Shannon

Stryker Minerva, Cork

MSD Biotech

MSD Biotech, Dublin

Stryker Springhill, Cork

Alexion Pharmaceuticals, Dublin

Edward Life Sciences Bay 37A & B Shannon

Edward Life Sciences Bay 37A & B, Shannon

Cook Medical

Cook Medical IRDC Expansion & Fit-Out, Limerick

ICON Medical

ICON Medical, Limerick

Element Six

Element Six, Shannon

Telefex Medical

Teleflex Medical D2/D3 Fit-Out Project, Limerick

Abbott, Sligo

Alkermes, Athlone

MSD Truegrid, Dunboyne

Regeneron, Limerick

Cardiac Booster

Cardiac Booster, Galway

Scroll to Top